I am an avid knitter, crocheter, quilter and all round crafty person with too little time to pursue this full time. I have caught the design bug big time and hope to use this Blog to contain my crafty ramblings to stop them going round and round in my head.
Saturday, November 05, 2005
Lily's Lemon Jumper - progress
I have finished the front & back and they are bang on the dimensions that I wanted to knit. I joined the shoulders and picked up the collar to knit a simple collar (2 rows of 2x2 rib then 7 rows of stocking stitch), which rolled over.
I miscalculated the length of the sleeve, so re -worked the figures. Once knitted however I realised that the cuff was a bit tight and would not last her very long. Back to the drawing board to recalculate again allowing for her chubby wrists. I'm only half way through one of the sleeves, so hope it worked this time.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment